Refurbishment and demolition survey: what it involves and when you need one

A refurbishment and demolition survey is the intrusive asbestos survey that needs to happen before building work disturbs the fabric of a building: a fit-out, a strip-out, structural alterations, plant removal or demolition. It looks for all the asbestos in the area where the work will take place (or the whole building if it is coming down), using destructive inspection where necessary, so that asbestos can be removed or avoided before the main works begin. This guide explains when you need one, what the surveyor will actually do, how to set the scope, and how to fit it into your project timetable.

  • When building work needs this survey rather than a management survey
  • What a fully intrusive survey involves and why the area must be empty
  • How to time it so removal doesn't hold up your project

By the Asbestos Survey Hub editorial team · Last reviewed

  • Independent guide
  • Free and no obligation
  • For UK businesses, landlords and organisations
  • ICO registration ZA810991

Get a quote for a refurbishment and demolition survey

Free and no obligation. Takes about a minute.

For UK businesses, landlords and organisations with non-domestic premises or the common parts of flats. We aren't a regulator and we don't survey or remove asbestos ourselves. Your enquiry goes to one partner only, chosen by your postcode and type of premises. Prices and terms are agreed directly with them; there's no obligation.

Refurbishment and demolition surveys: key facts

  • A refurbishment and demolition survey is needed before any refurbishment or demolition work, according to HSE's survey guide (HSG264). It may also be needed for more intrusive maintenance and repair, or for removing or dismantling plant.
  • It is fully intrusive. The surveyor may lift floors, open up walls and ceilings and break into the structure to find asbestos that a management survey would not reach.
  • The scope follows the work. For refurbishment it covers the area where the work will take place; for demolition it covers the whole building.
  • The area must be vacated during the survey and the surveyor must confirm it is fit for reoccupation afterwards (HSE).
  • The law expects asbestos to be removed first. For final demolition or major refurbishment, the plan of work must specify, so far as reasonably practicable, that asbestos is removed before other major works begin (regulation 7(3), Control of Asbestos Regulations 2012).
  • Contractors must not start work that could disturb asbestos without identifying it first, or presuming it is there (regulation 5).
  • Under CDM 2015 the client must provide pre-construction information as soon as practicable to designers and contractors being considered for the project. HSE says asbestos information should be part of it.
  • Commission the survey early. Licensed asbestos removal has to be notified to the enforcing authority at least 14 days before it starts, so a late survey can delay the whole programme.

What is a refurbishment and demolition survey?

It is one of the two types of asbestos survey described by HSE. Its job is to locate and describe, as far as reasonably practicable, all asbestos-containing materials (ACMs) in the area where refurbishment will take place, or in the whole building if demolition is planned, so they can be removed or dealt with before the work starts.

HSE recognises two types of asbestos survey: a management survey and a refurbishment or demolition survey. Both usually involve taking samples. They answer different questions.

Because the aim is to find everything, HSE's survey guide (HSG264) describes this survey as "fully intrusive" and says it will involve destructive inspection as necessary to reach all areas, including those that are difficult to reach. HSG264 also says it is technically more demanding than a management survey. Buildings are often altered many times, with false floors, ceilings and walls, hidden voids and drawings that were never updated. A management survey will not have looked behind concrete, between floors or inside cavity walls.

The report is also slightly different. Where asbestos is being identified so that it can be removed, HSG264 says the survey does not normally assess its condition, other than to note damage or likely debris. The core information is the type of product, where it is, how much there is and the type of asbestos. There is one important exception, covered in the timing section below: if the work will not happen for a significant period after the survey, the condition information that a management survey would record is needed too.

You may still see older terms such as a "Type 3 survey". HSE's survey guide replaced the older Type 1, 2 and 3 surveys with management and refurbishment/demolition surveys. If a quote or an old report uses the older terms, ask the surveyor to confirm which current survey type they mean.

When do you need a refurbishment and demolition survey?

HSG264 says this survey is needed before any refurbishment or demolition work. It may also be needed for more intrusive maintenance and repair, or when plant is being removed or dismantled. If the work will disturb the fabric of the building in places your management survey did not open up, you need one.

A management survey covers routine and simple maintenance. HSG264 says that where more extensive maintenance or repair is involved, the management survey may not give enough information and a localised refurbishment survey will be needed. Its rule of thumb is clear: a refurbishment survey is required for all work which disturbs the fabric of the building in areas where the management survey was not intrusive. HSE's own web guidance says the same: installation or refurbishment work that disturbs the fabric where asbestos could be hidden needs a more intrusive survey before work can start.

The decision sits with the dutyholder, though HSG264 expects you will probably need help from others, such as your surveyor, designer or contractor. In practice, the questions to ask are simple:

If the answer to any of these is yes, plan for a refurbishment and demolition survey of the affected area.

Planned workSurvey usually needed (HSG264)
Building in normal use, routine and simple maintenanceManagement survey
More extensive maintenance or repair that opens up the fabric where the management survey was not intrusiveLocalised refurbishment survey of the work area
Fit-out, strip-out or refurbishment of a room, floor or wingRefurbishment survey of the area where the work will take place
Removing or dismantling plantRefurbishment and demolition survey of the plant and its surroundings may be needed
Demolition of the whole buildingDemolition survey of the whole building

A recent management survey does not replace this survey, and neither does a clean-looking register. A management survey is deliberately limited in how far it opens up the building, so it cannot tell you what is behind a wall that is about to be removed.

Built in 2000 or later? HSE says to assume asbestos is present if a building was built or refurbished before 2000. For newer buildings it is unlikely, but HSE points out that older plant and equipment can still contain it. If you have strong evidence that the work area is asbestos-free, discuss it with your contractor and surveyor; the contractor still has to be satisfied under regulation 5 (see the next section).

What does the law require before refurbishment or demolition?

Regulation 5 of the Control of Asbestos Regulations 2012 stops an employer starting work that is liable to expose employees to asbestos unless it has identified the asbestos or presumes it is present. Regulation 7 requires a written plan of work and, for final demolition or major refurbishment, removal of asbestos before other major works so far as reasonably practicable. CDM 2015 requires the client to share pre-construction information early.

Several different pieces of law meet at the start of a building project. It helps to separate what the regulations say from what HSE's guidance recommends.

Regulation 5: identify asbestos before the work, or presume it

Under regulation 5 of the Control of Asbestos Regulations 2012 (CAR 2012), an employer must not carry out demolition, maintenance or any other work which exposes, or is liable to expose, its employees to asbestos unless it has either:

That duty falls on the employer doing the work, which for a building project usually means each contractor. Presuming asbestos is everywhere is lawful, but it means treating every material as if it contains the more hazardous types, with full precautions. HSE notes that it is often less troublesome and more proportionate to have a survey done. For a planned project, the survey is how the client gives contractors what they need to meet regulation 5.

Regulation 7: plan of work and removal first

Regulation 7 says an employer must not carry out any work with asbestos without a suitable written plan of work, and a copy must be kept on site while the work continues. Regulation 7(3) adds a specific rule for final demolition or major refurbishment: the plan of work must, so far as reasonably practicable, specify that asbestos is removed before any other major works begin, unless removal would cause a greater risk to employees than leaving it in place.

HSG264 goes a step further as guidance: it says removing ACMs is also appropriate in smaller refurbishments that involve structural or layout changes, such as taking out partitions, walls or units. That is HSE guidance rather than the wording of the regulation, but it reflects a simple point: if a wall is coming out, any asbestos in it will be disturbed.

CDM 2015: pre-construction information

Under regulation 4(4) of the Construction (Design and Management) Regulations 2015, a client must provide pre-construction information as soon as is practicable to every designer and contractor appointed, or being considered for appointment, to the project. HSE's guidance says clients and principal designers should assess whether existing information, including an asbestos survey, is adequate before construction, and that information about ACMs should be provided early as part of the pre-construction information. HSG264 says the survey information should be used to help tender for asbestos removal before work starts, and that the client should supply the report to designers and contractors who may be bidding.

The duty to manage still applies

If your premises are non-domestic, the duty to manage asbestos under regulation 4 continues alongside the project. Any asbestos that is left in place after the works, and any areas outside the work zone, still need to be in your register and management plan. HSE also says that when you set management actions you should consider planned refurbishment or installation work that may need ACMs removed, even if they are in good condition.

CAR 2012 applies in England, Scotland and Wales. Northern Ireland has its own Control of Asbestos Regulations (Northern Ireland) 2012, which are very similar and enforced by HSENI.

Planning building work? Get a refurbishment survey quote

Tell us about the project and one asbestos surveying firm or consultancy from our partners that covers your area can quote.

For UK businesses, landlords and organisations with non-domestic premises or the common parts of flats. We aren't a regulator and we don't survey or remove asbestos ourselves. Your enquiry goes to one partner only, chosen by your postcode and type of premises. Prices and terms are agreed directly with them; there's no obligation.

Should the survey cover just the work area or the whole building?

It depends on the work. For refurbishment, HSG264 says the survey covers the area where the work will take place, and the area and scope must be agreed between the dutyholder and the surveyor. For demolition, it covers the whole building.

Getting the scope right is the single most useful thing a client can do before the survey. Too narrow, and the contractor finds unsurveyed material halfway through the job. Too vague, and quotes cannot be compared.

Localised refurbishment surveys

For refurbishment, the survey only needs to cover the parts of the building the work will affect. HSG264 says that for minor refurbishment this may be just the room involved, or even part of a room where the work is small and the room is large. Its guidance on housing describes localised surveys of "a cupboard, part of a room, kitchen/bathroom". Further surveys will then be needed in other locations when new schemes come along.

Think about the full footprint of the work, not just the room on the drawing:

HSG264 says that in refurbishment surveys the area and scope of the work must be agreed between the dutyholder and the surveyor. The simplest way to do this is to mark the work areas on a drawing and attach the scope of works.

Demolition surveys

For demolition, the survey covers the whole building, and HSG264 says there should be no restrictions on access unless the site is unsafe (for example fire-damaged premises) or access is physically impractical. Its Appendix 1 also asks the surveyor to look beyond the building itself: a desk-top study of whether earlier structures, including underground ones, remain or may have left asbestos debris in the ground, and a visual check of the site for signs of earlier demolition.

Restrictions and "no access" areas

HSG264 warns that restrictions on scope or methods, by either the client or the surveyor, can seriously undermine the value of a survey. If restrictions are unavoidable, they must be agreed by both parties and recorded, ideally before work starts. Areas that could not be accessed must be clearly located on plans and in the report, so that the refurbishment or demolition can proceed progressively in those areas, with any asbestos found identified and removed at that point.

HSG264 is also candid that even a demolition survey with full access may not find every ACM, and some only come to light during demolition. That is why contractors still need procedures for unexpected finds, and why "no access" items in the report must be followed up rather than ignored.

What will the surveyor actually do during the survey?

Expect the surveyor to open up the building: lifting carpets, tiles and floorboards, entering ceiling voids, breaking into partitions and boxing, removing architraves and trims, inspecting risers, ducts and lift pits, and checking plant. Samples are taken and analysed, and the surveyor puts controls in place to stop debris spreading.

HSG264 describes this survey as disruptive. It may need to penetrate all parts of the structure, and the surveyor may lift carpets and tiles, break through walls, ceilings, cladding and partitions, and open up floors. Appendix 1 of HSG264 lists locations that should be examined, in addition to everything a management survey covers. It stresses that the list is not exhaustive. Examples include:

Help from other trades

Because the surveyor has to break into brickwork, timber, boards and panels, HSG264 says it may help to have a joiner, builder, maintenance worker or engineer on hand. Where concrete is to be sampled or brickwork removed, advice from a structural engineer may be needed. If your project already has a contractor or engineer appointed, it is worth agreeing who will provide this help before the survey date.

Some locations need extra arrangements. HSG264 says suspended ceilings made of asbestos insulating board that have not been accessed before should be entered using an enclosure and airlock built by a licensed asbestos removal contractor. Some plant, such as tanks or boilers, may need to be removed under controlled conditions before the debris beneath it can be found. Your surveyor should flag these at the planning stage so they can be priced and programmed.

Safety during the survey

HSG264 notes that the intrusive and destructive nature of this survey brings more hazards than a management survey, such as hidden electrical cables or pipes, or unstable structures. Expect the surveyor to ask about services and to agree who will isolate electricity, gas and other services. The surveyor should also put controls in place to prevent the spread of debris, which may include asbestos.

HSG264 says the surveyor needs some knowledge of construction, the right equipment and appropriate insurance, and that the competence needed is much greater than for a management survey. HSE strongly recommends using an accredited asbestos surveying organisation; UKAS is the accreditation body for asbestos inspection bodies in Great Britain. Accreditation is strongly recommended rather than a legal requirement, but any laboratory analysing the samples must be accredited (regulation 21).

Get a quote for a refurbishment and demolition survey Free and no obligation. Takes about a minute.
Get an asbestos survey quote

Does the area need to be empty during the survey?

Yes. HSE says the area must be vacated during a refurbishment or demolition survey, and the surveyor must confirm it is fit for reoccupation afterwards. HSG264 says this means a thorough visual inspection and, where appropriate, reassurance air sampling.

Because the survey involves destructive inspection and possible disturbance of asbestos, HSE says the area must be vacated while it is carried out. HSG264 is firm on this: staff must never remain in rooms or areas of buildings when intrusive sampling is being done.

Ideally, HSG264 says, the building should be out of service and all furnishings removed. For minor refurbishment, the requirement applies to the room involved, or even part of a large room. In that case there should be effective isolation of the survey area, such as a full floor-to-ceiling partition, and furnishings removed as far as possible or protected with sheeting.

Fit for reoccupation

Before anyone moves back in, the surveyed area must be shown to be fit for reoccupation. HSG264 says this requires a thorough visual inspection and, if appropriate (for example where there has been significant destruction), reassurance air sampling with disturbance. Ask the surveyor how they will do this for your project and whether air sampling is included in the quote.

When the building is still in use

Sometimes the rest of the building stays occupied. HSG264 gives examples: schools and colleges where the survey is done in one holiday and the works in the next, or a demolition survey commissioned to decide whether a building has a future. In those cases the survey needs very careful management, with people, equipment and furnishings moved out and protected as the survey progresses, and each surveyed area isolated and confirmed fit for reoccupation before people return.

Practical points for an occupied building

  • Agree a sequence of zones with the surveyor so that only one area is out of use at a time.
  • Tell staff, tenants and other occupiers which areas are closed, when, and why.
  • Arrange for furniture, stock and IT equipment to be moved or sheeted before the surveyor arrives.
  • Keep a record of when each area was confirmed fit for reoccupation.
  • Check what happens if the surveyor finds damaged material or debris in an area you need back quickly.

When should the survey happen in a building project?

As early as possible. HSG264 says refurbishment and demolition surveys should be built into the planning phase of a project. The report should go to designers and contractors at tender stage so asbestos removal can be priced and programmed, and licensed removal needs at least 14 days' notice to the enforcing authority.

Asbestos is one of the few things on a building project that can stop work on the day it is found. The best protection is to find it before the design is fixed and before contractors price the job. HSG264 says these surveys should be built into the planning phase as far as possible, to avoid delays and disruption. Only for urgent work, such as emergency repairs, may the survey have to be done just before the work itself.

  1. Gather what you already have. Your asbestos register, earlier survey reports, removal records, drawings and any health and safety file from earlier projects.
  2. Fix the outline scope of works. You need to know which areas will be disturbed before the survey can be scoped.
  3. Commission the refurbishment or demolition survey. Allow time for vacating the area, the survey itself, laboratory analysis and the report.
  4. Share the report as pre-construction information. Under CDM 2015 the client must provide pre-construction information as soon as practicable to designers and contractors appointed or being considered. HSE says asbestos information for planned work should be given as early as possible, for example when you ask for a quote.
  5. Design around what was found. Designers may be able to avoid disturbing some materials altogether. Otherwise, the report forms the basis of the removal tender.
  6. Appoint the removal contractor and allow for notification. Licensed work must be notified to the enforcing authority at least 14 days before it starts, unless the authority agrees a shorter time. Notifiable non-licensed work must be notified before it starts. The removal contractor prepares the written plan of work.
  7. Remove asbestos before the main works where regulation 7(3) applies, so far as reasonably practicable. After licensed removal, HSE says the area must be thoroughly cleaned and independently assessed by an analyst as fit for reoccupation.
  8. Update your records. Record what was removed and update your asbestos register and management plan for anything left in place.

If the works are delayed

A refurbishment and demolition survey normally records where asbestos is, what it is and how much there is, but not its condition. HSG264 says that if removal will not take place for some time (its example is three months), the condition of the ACMs needs to be assessed and the materials managed in the meantime, as they would be after a management survey. If your project stalls, tell your surveyor and ask what needs adding to the report.

Who decides whether removal needs a licensed contractor? HSE says the employer whose workers will do the work decides, based on the risk. Which category applies depends on the material and the work. That topic has its own guide; for the client, the point is that the survey report is what allows contractors to make that decision and price it accurately.

Get your refurbishment or demolition survey booked early

Share your scope and timescale. One asbestos surveying firm or consultancy from our partners that covers your area can quote.

For UK businesses, landlords and organisations with non-domestic premises or the common parts of flats. We aren't a regulator and we don't survey or remove asbestos ourselves. Your enquiry goes to one partner only, chosen by your postcode and type of premises. Prices and terms are agreed directly with them; there's no obligation.

What should you prepare before the survey?

Give the surveyor drawings with the work areas marked, the scope of works, earlier asbestos surveys and removal records, details of past alterations, access arrangements, service isolations and a decision on whether survey damage should be made good. Arrange vacant possession of the areas to be surveyed.

HSG264 (Box 7) lists the information a surveyor should collect when planning a survey. For a refurbishment or demolition survey, these are the items that make the most difference:

Checklist for the client

  • Drawings. Current plans, and if possible original drawings and specifications and plans of later alterations.
  • Scope of works. What is being stripped out, removed, cut into or demolished, marked on a site plan or architect's drawing.
  • Building history. When the building was built, extended, adapted or refurbished; underground sections; listed building or conservation area status.
  • Asbestos records. Earlier survey reports (including any old Type 1, 2 or 3 surveys), your current register, and records of asbestos removal or repairs.
  • Plant and services. Locations of services, heating and ventilation ducts, plant rooms, risers and lift shafts, and who is responsible for isolating power, gas and other services.
  • Occupation and access. Whether the area will be vacant, who will provide keys and access, and any access equipment needed for heights.
  • Making good. Whether survey damage is to be made good. If demolition or strip-out follows, you may decide it isn't needed; in an area returning to use, it usually is.
  • Site hazards. Anything the surveyor should know about, such as machinery, chemicals or fragile roofs.
  • Surrounding ground. Whether external areas and outbuildings are in scope.

The decision on making good matters more than many clients expect. A refurbishment survey leaves holes in walls, lifted floor finishes and opened ceilings. Agree in writing who reinstates what, to what standard, and whether that is in the surveyor's quote or left for your contractor.

Questions to ask a surveyor

For how these factors affect a quote, see the asbestos survey cost guide in the related links.

What should you do with the survey report?

Check it against what you asked for, then share it with your designers and the contractors pricing the work. Use it to tender any asbestos removal, follow up every no-access area, and update your asbestos register and management plan for any material that stays.

For each asbestos-containing material, HSG264 (Box 10) expects the report to record the type of product, its location, its extent or quantity and the type of asbestos, with condition information added if the work is delayed. Plans showing locations of samples and ACMs make the report far easier for contractors to use.

Check it before you rely on it

HSE and HSG264 suggest checks the client can make on any survey report. For a refurbishment or demolition survey, the most useful are:

Share it and act on it

What usually goes wrong

Refurbishment and demolition surveys: frequently asked questions

What is the difference between a management survey and a refurbishment and demolition survey?

A management survey is for a building in normal use and finds asbestos that could be disturbed during everyday occupation and routine maintenance, with only minor intrusion. A refurbishment and demolition survey is fully intrusive and aims to find all the asbestos in the area of planned work, or the whole building for demolition, so it can be removed or avoided before the work starts.

Is a refurbishment and demolition survey a legal requirement?

The regulations do not name a survey type. Regulation 5 of the Control of Asbestos Regulations 2012 requires an employer to identify asbestos before work that could disturb it, or to presume it is present and take full precautions. HSE's survey guide says a refurbishment and demolition survey is needed before any refurbishment or demolition work, and it is the normal way to meet that duty for planned building work.

Is a refurbishment survey the same as a demolition survey?

They are the same type of survey under HSE's guidance. The difference is scope: a refurbishment survey covers the area where the work will take place, while a demolition survey covers the whole building.

Can we stay in the building during the survey?

Not in the area being surveyed. HSE says the area must be vacated during the survey and confirmed fit for reoccupation afterwards. The rest of the building can sometimes stay in use if the survey area is effectively isolated and the survey is carefully managed zone by zone.

Do I need one for a small job such as new cabling or a kitchen refit?

If the job disturbs the fabric of the building in places your management survey did not open up, HSE's survey guide says a refurbishment survey is required. For small jobs this can be a localised survey of just the work area, such as one room or part of a room.

Who should commission the survey, the client or the contractor?

Usually the client, because the survey results are pre-construction information that CDM 2015 requires the client to share with designers and contractors being considered for the work. The contractor still has its own duty under regulation 5 to be satisfied that asbestos has been identified before it starts.

Will the surveyor damage the building?

Yes, as necessary. The survey can involve lifting floor finishes, opening ceilings and breaking into walls and boxing. Agree in advance whether survey damage will be made good, by whom and to what standard.

Does all the asbestos have to be removed before refurbishment?

For final demolition or major refurbishment, regulation 7(3) requires the plan of work to specify, so far as reasonably practicable, that asbestos is removed before other major works begin, unless removal would cause greater risk. HSE's survey guide says removal is also appropriate in smaller works with structural or layout changes. Material that will not be disturbed may be left in place and managed.

How far ahead should we book the survey?

As early as you can once the outline scope is known. Licensed asbestos removal must be notified to the enforcing authority at least 14 days before it starts, and contractors cannot price the job properly without the report, so a late survey often delays the start on site.

What happens if the works are delayed after the survey?

HSE's survey guide says that if removal will not happen for some time, the condition of the asbestos needs to be assessed and the materials managed in the meantime. Its example is a delay of about three months. Ask your surveyor to add the condition information a management survey would normally record.

Can a refurbishment and demolition survey miss asbestos?

It aims to find all the asbestos as far as reasonably practicable, but HSE's survey guide accepts that some materials may only come to light during demolition, and some areas may not be accessible. No-access areas should be clearly shown in the report and followed up, and contractors should have procedures for dealing with unexpected finds.

Does this apply in Northern Ireland?

Northern Ireland has its own Control of Asbestos Regulations (Northern Ireland) 2012, which are very similar to the regulations in Great Britain and are enforced by HSENI. Check HSENI's guidance if your premises are in Northern Ireland.

Get a quote for a refurbishment and demolition survey

Free and no obligation. Takes about a minute.

For UK businesses, landlords and organisations with non-domestic premises or the common parts of flats. We aren't a regulator and we don't survey or remove asbestos ourselves. Your enquiry goes to one partner only, chosen by your postcode and type of premises. Prices and terms are agreed directly with them; there's no obligation.

Sources

We checked the facts on this page against these sources on 14 November 2026:

This guide is general information for UK businesses, landlords and organisations, not legal or health and safety advice. The Control of Asbestos Regulations 2012 apply in England, Scotland and Wales; Northern Ireland has its own 2012 regulations. Asbestos Survey Hub is an independent guide. We are not the HSE or any regulator, and we don't survey, sample, test or remove asbestos ourselves. If you ask us to, we'll put you in touch with one asbestos surveying firm or asbestos consultancy from our partners that covers your area.